Smithy Ez-Trol2 Instrukcja Użytkownika

Przeglądaj online lub pobierz Instrukcja Użytkownika dla Ekwipunek Smithy Ez-Trol2. Smithy Ez-Trol2 User Manual Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 83
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 0
EZ-TROL II CONTROL SYSTEM
USER’S GUIDE
VERSION 1.1
2009
Przeglądanie stron 0
1 2 3 4 5 6 ... 82 83

Podsumowanie treści

Strona 1 - USER’S GUIDE

EZ-TROL II CONTROL SYSTEMUSER’S GUIDEVERSION 1.1 2009

Strona 2 - Smithy Co

Telephone Support (Service engineers are available 8 am to 5 pm EST):Service and PartsTel No. 1-800-476-4849Fax No. 1-734-913-6663Email Address: sales

Strona 3 - TABLE OF CONTENTS

SAFETYOVERVIEWThis section is the most important section of the manual. Remember safety should always bepriority number one and always let common sen

Strona 4

9 Only qualified trained personnel should perform maintenance and testing on electrical circuits and components.10 Do not run the machine or condu

Strona 5

CONTROL SYSTEM COMPONENTS & FUNCTIONSThe Smithy EZ-Trol II is equipped with 2 control panels located on the operator’s side of the box(opposite th

Strona 6

E-STOP CONTROL PANELFigure 4.2 EZ-Trol II E-Stop Control Panel1. E-Stop Button – Round red mushroom head push button which when depressed until it lat

Strona 7 - INTRODUCTION

BASIC ELECTRICAL COMPONENTS AND ITS FUNCTIONS1. Motherboard – Chosen specifically to handle the real time requirements of CNC control pro-grams for ou

Strona 8 - QUESTIONS?

a.MESA Electronics 7I47 RS-422 Interface Board (UpperBoard) – Provides 12 RS422 transmitters and 12 RS422 receiversfor differential signaling. b. MESA

Strona 9 - WARRANTY

CONNECTING EZ-TROL IISmithy lathes and mills are equipped with the required cables and connectors for connecting theEZ-Trol system to the machine. In

Strona 10 - Service and Parts

Be sure to place it in a location that is level and away from potential water exposure. The powersupply box is equipped with handles on the top of th

Strona 11 - OVERVIEW

Figure 5.4 SmithyCNC EZ-Trol II Plug Layout for SmithyCNC 622Bed MillCONNECTING THE EZ-TROL II TO THE CNC 924 LATHEThe power supply enclosure for the

Strona 12 - Toll Free 1-800-476-4849

SmithyCNC EZ-Trol II Control System User’s GuideSmithyCNC (Smithy Co.)170 Aprill Dr., Ann Arbor, MichiganUSA 48103Toll Free Hotline: 1-800-476-4849Fax

Strona 13 - & FUNCTIONS

LAUNCHING EZ-TROL IIBOOTING EZ-TROL II CONTROL SYSTEMMost of time, you will need to turn on your machine when you launch the EZ-Trol II control system

Strona 14 - CABLE CONNECTION PANEL

Step 6: A welcome screen will appear that will prompt you to choose what kind of machine you areusing. Click on your machine and the Manual Tab will a

Strona 15 - Figure 4.3 EZ-Trol II

NAVIGATING EZ-TROL IITHE EZ-TROL II TABSEZ-Trol II’s interface is broken down into tabs. Each tab is given its own section in this manual thatdescribe

Strona 16 - 10

MANUAL TABThe Manual Tab shown above is used to manually jog the machine’s axes. This is also the screenwhere homing the machine and MDI (manual data

Strona 17 - CONNECTING EZ-TROL II

WIZARDS TABThe newest feature of the new EZ-Trol II Control System is that it has built-in machining Wizardsthat ease your common programming tasks.

Strona 18 - 12

F11 - used to switch the screen between fullscreen and window mode.• Sliders-Sliders such as those shown on the Auto Screen in figure 5-3 under the “F

Strona 19 - Bed Mill

HOMING & SETTING OFFSETSOVERVIEWThis chapter will familiarize you with the process of setting home positions for the Smithy CNC bedmill. The cont

Strona 20 - LAUNCHING EZ-TROL II

Figure 8.1 Homing AxesFigure 8.2 Axis Set-up Screen as described on Step 3www.smithycnc.com | 21

Strona 21 - 240 Bed Mill

As each axis moves, watch carefully to become familiar with the speed and direction of movement. If necessary, axes can be interrupted during the hom

Strona 22 - NAVIGATING EZ-TROL II

NOTE: You can tell if the machine is in E-Stop by the red colored E-Stop button on the machine.You will need to click this to start the machine. The m

Strona 23 - SETTINGS TAB

TABLE OF CONTENTS1 | INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1Development Process . . . . . . . .

Strona 24 - WIZARDS TAB

G-Code programming is designed to tell a motor located on the end of each axis screw to act as thehand wheel for that axis. G-Code, much like any hum

Strona 25 - BACKLASH COMPENSATION

G0 Z0 X0 Y0G1 F10 M3 S1000 Z-0.25Y-1X-1Y0X0G0 Z0M2Not only does this program set the feedrate, it adds a few new elements as well. Notice, the firstb

Strona 26 - HOMING & SETTING OFFSETS

NOTE: You can use the MDI entry point in the manual tab to run this program if you wish.COORDINATE SYSTEMS & OFFSETSA number describes the positio

Strona 27 - Figure 8.1 Homing Axes

Figure 8.6 Left: Machine is at Home Position (G54); Right: Part is at Home PositionSmithyCNC 1240 Bed Mill shown.VISEMAIN TABLESTEPPERMOTORVISEMAIN TA

Strona 28 - LIMIT OVERRIDE

NAVIGATING THE AUTO TAB OVERVIEWThis section will introduce the features of the Auto screen and explain how to execute a partprogram from this screen.

Strona 29 - BASIC G-CODE

1 POSITION AREAThe position area of the Auto Tab has a digital display of the machine’s positioning of each axis. Ifany of the axis displays are oran

Strona 30

2A PAN ACROSS DISPLAY AREAThe perspective of the view is changed by clicking and dragging the mouse. 2B ZOOM IN OR OUT ON THE VIEWTo change the size

Strona 31

key switch on the front of the control box to the “Safe” mode before proceeding with the toolchange. This will prevent an unfortunate and dangerous a

Strona 32 - 26

10 FEED HOLDClicking the FEED HOLD button, denoted by 9 in figure 9.1, will “freeze” the movement of themachine’s axes but it will not turn off the sp

Strona 33

NAVIGATING THE MANUAL TABOVERVIEWThis section will introduce the features of the Manual screen and describe when the features foundon this screen are

Strona 34 - NAVIGATING THE AUTO TAB

Initial Machine Homing - one axis at a time . . . . . . . . . . . . . . . . 20Homing Your Machine on All Axes . . . . . . . . . . . . . . . . . . . .

Strona 35 - 2 TOOL PATH DISPLAY AREA

1 POSITION AREAThe position area of the Auto Tab displays the position of each machine axis. If the numberdisplayed is orange, the machine is not in

Strona 36

direction of travel is the direction that the cutter will follow as it passes the work piece. Clickingon the X- button will cause the table to move t

Strona 37

5 FEED OVERRIDE EZ-Trol allows the operator to adjust the feed rate up to 120% but it cannot adjust the feed rate at apercentage that would increase t

Strona 38 - 32

12 MANUAL DATA INPUTThis field is used for manually entering and executing G-code commands. For instance, it can beused to verify the position of an

Strona 39 - NAVIGATING THE MANUAL TAB

NAVIGATING THE SETTINGS TABSETTINGS TAB PARTSThe Settings tab allows the user to open, edit and save files. Work piece and tool offsets are alsocreat

Strona 40

Pocket - This is used with machines that have ATC (automatic tool changers). EZ-Trol is designed to fit a wide range of machines, some of which may ha

Strona 41 - 4 STATUS BLOCK

The add and subtract radio buttons, denoted by item 3E, tell EZ-Trol to “Add” or “Subtract” the toolradius or length to/from the part zero position.4

Strona 42

NAVIGATING THE WIZARDS TAB OVERVIEWThe EZ-Trol II Control System is designed with built-in machining Wizards that will ease yourcommon G-Code programm

Strona 43 - 14 COOLANT

1 NAVIGATION MENUThe navigation menu lets you do different operations on the Wizards Tab. It includes the follwingoperations:a.NEW-lets you create a n

Strona 44 - NAVIGATING THE SETTINGS TAB

It also lists other important operations that you can use in order to create and save a G-code pro-gram.GENERAL SETTINGSThe first step in using the wi

Strona 45

Manual Data Input. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37Spindle . . . . . . . . . . . . . . . . . . . . . . . . . .

Strona 46 - SETTING-UP A PROJECT

ADD NEW OPERATIONAs mentioned earlier, the output of several Wizards can be strung together to build a complete CNCpart program. To build up the list

Strona 47 - NAVIGATING THE WIZARDS TAB

To add this wizard to your operation list simply click the ADD button. We will then be presentedwith several input boxes and other options related to

Strona 48 - 42

After filing in all the needed information click on ''Send to Control'. This action will generate theG-Code for your program and also

Strona 49 - TOOLS SELECTION

Operations can also be rearranged by moving it up or down the list. You can also delete anyoperation. To do so simply right click on the operation nam

Strona 50 - 44

Figure 12.13 Loaded G-Code Program on Auto Tabw SmithyCNC EZ-Trol II Control System48 | Toll Free 1-800-476-4849

Strona 51

UNDERSTANDING G-CODESOVERVIEWThis chapter is designed for the less experienced G-code programmer is written to give the novicea bit more assistance in

Strona 52 - 46

BASIC G-CODE THEORYCNC machine tools are controlled by instructions written in a language defined in a document fromthe Electronic Industries Alliance

Strona 53 - Figure 12.12 Save Button Menu

www.smithycnc.com | 51UNDERSTANDING THE G-CODE PROGRAMThis section of this chapter will look at the blocks of code generated by EZ-Trol, one by one, i

Strona 54 - 48

N10G04 P5.0Block 10 causes the machine to dwell (G4) for a period of five seconds. This allows the spindle toget up to speed before drilling begins.N

Strona 55 - UNDERSTANDING G-CODES

www.smithycnc.com | 53N20G04 P5.0Block 20 paused the machine, G04 for period of five seconds, allowing the spindle to come up tospeed.N21G43Z1.H2Block

Strona 56 - BASIC G-CODE THEORY

To Add More Programming the Machine . . . . . . . . . . . . . . . . . . 6216 | ELECTRICAL PIN OUTS . . . . . . . . . . . . . . . . . . . . . . . . . .

Strona 57

N41Y.325N42X2.025N43Y1.675N44X.725N45Y1.075N46X.525N47Y.125N48X2.225N49Y1.875N50X.525N51G1G40X.525Y1.075Block 51 moves the machine to X.525 and 1.075.

Strona 58 - 52

www.smithycnc.com | 55N59G3X1.6Y1.I-.225Block 59 mills another counterclockwise arc starting and ending at X1.6. The center cutter in nowlocated -.22

Strona 59

w SmithyCNC EZ-Trol II Control System56 | Toll Free 1-800-476-4849PREPARING YOUR MACHINE BEFORE OPERATIONOVERVIEWBefore a part program can be run, the

Strona 60 - 54

www.smithycnc.com | 573 Left click on the “Settings” tab.4 The upper right portion of the screen is dedicated to coordinate system offsets. Looking fi

Strona 61

58 | Toll Free 1-800-476-4849w SmithyCNC EZ-Trol II Control SystemWARNING: Do not jog the Z-axis in a negative direction toward the zero surfaces with

Strona 62 - SETTING WORKPIECE OFFSETS

www.smithycnc.com | 59• The "Diameter" field hold the tool diameter.To measure the length of a tool in the spindle, follow the same procedur

Strona 63

ADDING COMPONENTSOPEN ARCHITECTURE LAYOUT (Easy Upgrade of Computer Components)The open architecture and layout of the control’s electrical components

Strona 64 - POPULATING TOOL TABLE

www.smithycnc.com | 61NOTE: You may also add new terminal boards if needed. Please refer to the wiring diagram for theproper witing layout.Step 4: Tes

Strona 65

ELECTRICAL PIN OUTSSECTION 1: 50 pin DDPIN AXIS FUNCTION DIR1 Machine PE COM2 X ENA 1 (MF1)+ OUT3 X ENA 1 (MF1)- OUT4 X READY 1 (TM)+ IN5 X READY 1 (T

Strona 66 - ADDING COMPONENTS

www.smithycnc.com | 63PIN AXIS FUNCTION DIR252627282930313233 SPINDLE AGND COM34 SPINDLE DGND COM35 MACHINE /PROBE OUT36 MACHINE /FLOOD-M8 OUT37 SPIND

Strona 67

1INTRODUCTIONThank you for choosing the SmithyCNC EZ-Trol II Control System as the CNC control option foryour SmithyCNC machine. Smithy’s unique EZ-T

Strona 68 - ELECTRICAL PIN OUTS

w SmithyCNC EZ-Trol II Control SystemPINCNC 622MILLDIR FUNCTIONCNC 924LATHEDIR FUNCTION1 PE COM SAFETY GROUND PE COM SAFETY GROUND2 PU1+ OUT XSTEP+ PU

Strona 69

PINCNC 622MILLDIR FUNCTIONCNC 924LATHEDIR FUNCTION26AVIOUTSPEEDAVIOUTSPEED27 GND COM ANALOG GROUND GND COM ANALOG GROUND28 KA1 OUT DIR(REV) N/C29 KA2

Strona 70 - SECTION 2: 31 pin DD

17SCHEMATICSOVERVIEWThis section shows all the necessary schematics of the control system. All the diagrams areproperly labeled and numbered. Please h

Strona 71 - SECTION 3: 9 pin (Lathe Only)

SCHEMATICS 1: SmithyCNC 622 Bed Mill Part 1Call Us Toll Free 1-800-476-4849 or visit www.smithy.com 67

Strona 72 - SCHEMATICS

SCHEMATICS 2: SmithyCNC 622 Bed Mill Part 2Call Us Toll Free 1-800-476-4849 or visit www.smithy.com 68

Strona 73

SCHEMATICS 3: SmithyCNC 622 Bed Mill Part 3Call Us Toll Free 1-800-476-4849 or visit www.smithy.com 69

Strona 74

SCHEMATICS 4: SmithyCNC 924 Lathe Part 1Call Us Toll Free 1-800-476-4849 or visit www.smithy.com 70

Strona 75

SCHEMATICS 5: SmithyCNC 924 Lathe Part 2Call Us Toll Free 1-800-476-4849 or visit www.smithy.com 71

Strona 76

SCHEMATICS 6: SmithyCNC 924 Lathe Part 3Call Us Toll Free 1-800-476-4849 or visit www.smithy.com 72

Strona 77

SCHEMATICS 7: SmithyCNC 924 Lathe Part 4Call Us Toll Free 1-800-476-4849 or visit www.smithy.com 73

Strona 78

control system. Please be sure you are comfortable with the concepts presented beforeproceeding to using the control system. QUESTIONS?Again, thank

Strona 79

SCHEMATICS 8: SmithyCNC 1240 bed MillCall Us Toll Free 1-800-476-4849 or visit www.smithy.com 74

Strona 80

AppendixAPPENDIX ASETTING TOOL LENGTH OFFSETSThis operation is done when you need to measure the tools using the machine to determinethe tool length b

Strona 81 - Appendix

APPENDIX BFILE SHARING BETWEEN THE EZ-TROL II CONTROL SYSTEM &WINDOWS PC SYSTEM THAT ARE BOTH ON THE SAME NETWORKThis operation can be achieved in

Strona 82 - APPENDIX B

APPENDIX CBASIC INSTRUCTIONS FOR CONNECTING EZ-TROL II TO A WIRELESSNETWORKThe steps described below are the basic procedures on how you can connect E

Strona 83 - APPENDIX C

WARRANTYSmithy WarrantySmithyCNC warrants its machines and control systems for a period of one (1) year to theoriginal purchaser from the date of purc

Komentarze do niniejszej Instrukcji

Brak uwag